انتقل إلى وضع عدم الاتصال باستخدام تطبيق Player FM !
Sorkin' In It 3.5: The Long Lead Story (Studio 60 Episode 5)
Manage episode 412181819 series 59403
Lauren Graham hosts Studio 60 (but we barely see her). Christine Lahti plays a reporter and we see more of her (a Lahti of her? Is that a thing?). We get a lot of Matt/Harriet star-crossed romance (yawn). But we do get a lotta lute (which is fun to say, try it!).
Meanwhile Jordan passes on a surefire hit, and we’re still shipping her and Danny (the kids still call it shipping, right?).
Anyway, it’s a new Sorkin’ In It (yay!).
1609 حلقات
Manage episode 412181819 series 59403
Lauren Graham hosts Studio 60 (but we barely see her). Christine Lahti plays a reporter and we see more of her (a Lahti of her? Is that a thing?). We get a lot of Matt/Harriet star-crossed romance (yawn). But we do get a lotta lute (which is fun to say, try it!).
Meanwhile Jordan passes on a surefire hit, and we’re still shipping her and Danny (the kids still call it shipping, right?).
Anyway, it’s a new Sorkin’ In It (yay!).
1609 حلقات
Tất cả các tập
×مرحبًا بك في مشغل أف ام!
يقوم برنامج مشغل أف أم بمسح الويب للحصول على بودكاست عالية الجودة لتستمتع بها الآن. إنه أفضل تطبيق بودكاست ويعمل على أجهزة اندرويد والأيفون والويب. قم بالتسجيل لمزامنة الاشتراكات عبر الأجهزة.