Ep 42 Snowy Hydro Scheme - Pt 5 - Completion: Australian History
Manage episode 275314747 series 2362787
This episode concludes the series exploring the Snowy Mountains Hydro-Electric Scheme; the vast hydro electric, and irrigation project, that began in 1949 and was under construction for 25 years.
As well as providing much needed electricity and irrigation water to a soon to be booming Australia, the international workforce helped usher in the era of Multiculturalism, and the project developed engineering expertise and pride, at a time of great optimism in Australia.
(52 mins)
Enjoying the podcast?
Help support the show with
75 حلقات
Manage episode 275314747 series 2362787
This episode concludes the series exploring the Snowy Mountains Hydro-Electric Scheme; the vast hydro electric, and irrigation project, that began in 1949 and was under construction for 25 years.
As well as providing much needed electricity and irrigation water to a soon to be booming Australia, the international workforce helped usher in the era of Multiculturalism, and the project developed engineering expertise and pride, at a time of great optimism in Australia.
(52 mins)
Enjoying the podcast?
Help support the show with
75 حلقات
Tous les épisodes
×مرحبًا بك في مشغل أف ام!
يقوم برنامج مشغل أف أم بمسح الويب للحصول على بودكاست عالية الجودة لتستمتع بها الآن. إنه أفضل تطبيق بودكاست ويعمل على أجهزة اندرويد والأيفون والويب. قم بالتسجيل لمزامنة الاشتراكات عبر الأجهزة.